From India’s first hyperloop sub-scale test track to active government contracts — TuTr is building the infrastructure to make hyperloop a commercial reality.
TuTr’s 410-metre sub-scale hyperloop test track, located at the IIT Madras Discovery Campus, is the physical foundation of everything we build. It is where propulsion, levitation, and control systems are validated before any corridor goes live.
| Pack | 2026 | 2027 | 2028 | 2029 | 2030 | 2031 | 2032 | 2033 |
|---|---|---|---|---|---|---|---|---|
| Pack 1LIM | TRL 6POC active | TRL 6+Multiple POCs | TRL 7First commercial km | |||||
| Pack 2Levitation | TRL 3POC in dev | TRL 4Sub-scale POC | TRL 5POC delivered | TRL 6Full-scale POC | TRL 7First corridor | |||
| Pack 3Vacuum | TRL 3POC in dev | TRL 4Sub-scale POC | TRL 5POC delivered | TRL 6Full-scale POC | TRL 7First corridor |
TuTr’s in-house lab infrastructure spans propulsion testing, electromagnetic levitation validation, integrated system rigs, control simulation, and high-voltage electrical characterisation. Every subsystem is tested in isolation and in combination before it reaches a corridor — ensuring that what gets deployed has already been proven under real operating conditions.
Our collaboration with IIT Madras is the academic and research spine of TuTr’s technology stack. It is not just an incubation relationship — it is an active, ongoing engineering partnership.
Faculty-led R&D
Discovery Campus
PhDs & interns
Global credibility
10+ in pipeline
Live validation
RDSO & Ministry
IP → deployment
Ports, rail, metro
Backs the research
Commercial focus
L&T, Bosch, BHEL